SYSADVANCE | Waste Water Treatment Plant @ Lisbon

SYSADVANCE is the long-time technology partner of Dourogás for Biomethane production, with its state-of-the-art METHAGEN process. The new project has been designed to purify biogas from the sludge digester of one of the biggest waste water treatment plants from the city of Lisbon, Portugal. This is the second biogas upgrading plant acquired by Dourogás from […]

SYSADVANCE | Containerized VSA Oxygen Generator @ France

SYSADVANCE is finalizing another Plug&Play containerized system for oxygen onsite generation by VSA technology. This system will be supplying Oxygen for an aquaculture unit in France. SYSADVANCE VSA system will produce an outlet gas flow of 30 m3/h at 93% oxygen concentration with the lowest power consumption on the market: just 0.55 KW.hr per cubic […]

SYSADVANCE @ Arab Health 2022 | Dubai | STAND S3. C01

SYSADVANCE will be attending Arab Health 2022, in Dubai, from 24 – 27 January. Arab Health is the largest event of healthcare and trade professionals in the Middle East and North Africa region (MENA). Visit us at STAND S3. C01 and get to know our oxygen onsite solutions – Medical Oxygen Generators, Medical Air, Medical […]

Merry SYSxmas 2021

SYSADVANCE team wishes a Merry Christmas and a Successful 2021 to all our Customers, Suppliers, Business Partners and Friends.

SYSADVANCE @ RNG CONFERENCE 2021 | USA

SYSADVANCE is back at RNG Conference, in Dana Point, California (USA), from 13 – 16 December. SYSADVANCE invites you to review the latest track records of our Biogas Upgrading, Landfill Gas and CO2 Capture installations. Please reach us to set appointments at suitable convenience during the event. More info: https://www.linkedin.com/search/results/content/?keywords=rng%20conference%20schedule&sid=zWR&update=urn%3Ali%3Afs_updateV2%3A(urn%3Ali%3Aactivity%3A6871153046525624320%2CBLENDED_SEARCH_FEED%2CEMPTY%2CDEFAULT%2Cfalse)

SYSADVANCE | Anaerobic Digestion System @ Sweden

SYSADVANCE is finalizing the last FAT tests on our METHAGEN Anaerobic Digestion system for biogas purification, to be installed in Sweden. The system will start in early 2022, and will produce around 270 Nm3/h of biomethane, for grid injection.