ENERGY

REFERENCES

METHAGEN AD

• Feedstock: Municipal organic waste
• Offtake: Renewable CNG truck fueling @ 4000 psig
• Location: Mirandela, Portugal
• Commissioned: 2016
• Capacity: 165 Nm3/h | 100 scfm
• Awards: 1st RNG system in Portugal
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

methagen AD

METHAGEN AD (2-Stage)

• Feedstock: Municipal organic waste
• Offtake: Pipeline quality RNG (SoCalGas)
• Location: Perris, CA, USA
• Commissioned: 2017
• Capacity: 1000 Nm3/h | 600 scfm
• Awards: 1st system to meet Rule 30 specification in CA
• Performance: < 2000 ppm of O2, High BTU (CH4 >98,2%)
• Recovery: up to 98%
• OpEx: < 0,03 kWh/Nm3 | < 0.048 kW/scfm

methagen AD

METHAGEN LF (2-Stage)

• Feedstock: Landfill Gas (with ≤20% Air)
• Offtake: Pipeline quality RNG
• Location: Paris, France
• Commissioned: 2018
• Capacity: 500 Nm3/h | 300 scfm
• Awards: 1st (non-cryogenic) pipeline RNG system in France. Patented technology with highest N2 reduction
• Performance: > 96.7% CH4
• Recovery: up to 98%
• OpEx: 0,32 kWh/Nm3 | 0.514 kW/scfm of Landfill Gas

METHAGEN AD (2-Stage) + CO2 Recovery

• Feedstock: Wastewater sludge
• Offtake: Pipeline quality RNG
• Location: Portland, Oregon, USA
• Installed: 2019
• Capacity: 1500 Nm3/h | 900 scfm
• Awards: 100% CH4 recovery (w/ CO2 capture & purification)
• Performance: > 98% CH4, < 0.2% O2
• Recovery: 99.96%
• OpEx: < 0,03 kWh/Nm3 | < 0.048 kW/scfm

methagen AD co2 recovery

METHAGEN AD

• Feedstock: Agro Waste
• Offtake: Pipeline quality RNG
• Location: Prémery, France
• Installed: 2020
• Capacity: 250 Nm3/h | 150 scfm
• Awards: 1st of six plants same client
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

methagen AD

METHAGEN LF (2-Stage)

• Feedstock: Landfill Gas (with ≤20% Air)
• Offtake: Renewable CNG + Pipeline quality RNG
• Location: Granada, Spain
• Commissioned: 2021
• Capacity: 500 Nm3/h | 300 scfm
• Awards: 1st landfill project for CNG mobility in Spain. Patented technology with highest N2 reduction
• Performance: > 96% CH4
• Recovery: up to 98%
• OpEx: 0,30 kWh/Nm3 | 0.482 kW/scfm of Landfill Gas

methagen LF

METHAGEN AD

• Feedstock: Wastewater sludge
• Offtake: Renewable CNG
• Location: Boden, Sweden
• Commissioned: 2022
• Capacity: 500 Nm3/h | 300 scfm
• Awards: Indoor Installation (60 miles from Artic circle)
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

methagen AD

METHAGEN AD

• Feedstock: Wastewater sludge
• Offtake: Renewable CNG truck fueling @4000psig
• Location: Lisbon, Portugal
• Commissioned: 2022
• Capacity: 500 Nm3/h | 300 scfm
• Awards: 1st Methanation Unit in Portugal
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

METHAGEN AD

• Feedstock: Organic Waste
• Offtake: Pipeline quality RNG
• Location: Turkey
• To be installed: 2023
• Capacity: 360 Nm3/h | 200 scfm
• Awards: Complex integration within a food & beverage corporation
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

methagen AD

METHAGEN AD

• Feedstock: Chicken manure
• Offtake: Pipeline quality RNG @ 17 barg
• Location: Latvia
• To be installed: 1st phase 2023, expansion 2024
• Capacity: 2000 Nm3/h + 1000 Nm3/h | 1200 scfm + 600 scfm
• Awards: Largest Biogas Upgrading system in Latvia
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

METHAGEN AD

• Feedstock: Manure
• Offtake: Pipeline quality RNG
• Location: USA
• To be installed: 2023
• Capacity: 500 Nm3/h | 300 scfm
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

METHAGEN AD

• Feedstock: Manure
• Offtake: Pipeline quality RNG
• Location: USA
• To be installed: 2023
• Capacity: 750 Nm3/h | 450 scfm
• Performance: > 97% CH4
• Recovery: > 99%
• OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas

methagen AD