Home › Energy › Energy References

ENERGY
REFERENCES

From Pioneering Biomethane/RNG Projects to Large-Scale Installations Worldwide

METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Municipal organic waste
  • Offtake: Renewable CNG truck fueling @ 4000 psig
  • Location: Mirandela, Portugal
  • Commissioned: 2016
  • Capacity: 165 Nm3/h | 100 scfm
  • Awards: 1st RNG system in Portugal
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN AD

Energy

METHAGEN AD

2 STAGE

  • Feedstock: Municipal organic waste
  • Offtake: Pipeline quality RNG (SoCalGas)
  • Location: Perris, CA, USA
  • Commissioned: 2017
  • Capacity: 1000 Nm3/h | 600 scfm
  • Awards: 1st system to meet Rule 30 specification in CA
  • Performance: < 2000 ppm of O2, High BTU (CH4 >98,2%)
  • Recovery: up to 98%
  • OpEx: < 0,03 kWh/Nm3 | < 0.048 kW/scfm
METHAGEN LF

Energy

METHAGEN LF

2 STAGE

  • Feedstock: Landfill Gas (with ≤20% Air)
  • Offtake: Pipeline quality RNG
  • Location: Paris, France
  • Commissioned: 2018
  • Capacity: 500 Nm3/h | 300 scfm
  • Awards: 1st (non-cryogenic) pipeline RNG system in France. Patented technology with highest N2 reduction
  • Performance: > 96.7% CH4
  • Recovery: up to 98%
  • OpEx: 0,32 kWh/Nm3 | 0.514 kW/scfm of Landfill Gas
METHAGEN AD + CO2 Recovery

Energy

METHAGEN AD + CO2 Recovery

2 STAGE

  • Feedstock: Wastewater sludge
  • Offtake: Pipeline quality RNG
  • Location: Portland, Oregon, USA
  • Installed: 2019
  • Capacity: 1500 Nm3/h | 900 scfm
  • Awards: 100% CH4 recovery (w/ CO2 capture & purification)
  • Performance: > 98% CH4, < 0.2% O2
  • Recovery: 99.96%
  • OpEx: < 0,03 kWh/Nm3 | < 0.048 kW/scfm
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Agro Waste
  • Offtake: Pipeline quality RNG
  • Location: Prémery, France
  • Installed: 2020
  • Capacity: 250 Nm3/h | 150 scfm
  • Awards: 1st of six plants same client
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN LF

Energy

METHAGEN LF

2 STAGE

  • Feedstock: Landfill Gas (with ≤20% Air)
  • Offtake: Renewable CNG + Pipeline quality RNG
  • Location: Granada, Spain
  • Commissioned: 2021
  • Capacity: 500 Nm3/h | 300 scfm
  • Awards: 1st landfill project for CNG mobility in Spain. Patented technology with highest N2 reduction
  • Performance: > 96% CH4
  • Recovery: up to 98%
  • OpEx: 0,30 kWh/Nm3 | 0.482 kW/scfm of Landfill Gas
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Wastewater sludge
  • Offtake: Renewable CNG
  • Location: Boden, Sweden
  • Commissioned: 2022
  • Capacity: 500 Nm3/h | 300 scfm
  • Awards: Indoor Installation (60 miles from Artic circle)
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Wastewater sludge
  • Offtake: Renewable CNG truck fueling @4000psig
  • Location: Lisbon, Portugal
  • Commissioned: 2022
  • Capacity: 500 Nm3/h | 300 scfm
  • Awards: 1st Methanation Unit in Portugal
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Organic Waste
  • Offtake: Pipeline quality RNG
  • Location: Turkey
  • Installed: 2023
  • Capacity: 360 Nm3/h | 200 scfm
  • Awards: Complex integration within a food & beverage corporation
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Chicken manure
  • Offtake: Pipeline quality RNG @ 17 barg
  • Location: Latvia
  • Installed: 1st phase 2023, expansion 2024
  • Capacity: 2000 Nm3/h + 1000 Nm3/h | 1200 scfm + 600 scfm
  • Awards: Largest Biogas Upgrading system in Latvia
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN AD

Energy

METHAGEN AD

  • Feedstock: Manure
  • Offtake: Pipeline quality RNG
  • Location: USA
  • Installed: 2023
  • Capacity: 500 Nm3/h | 300 scfm
  • Performance: > 97% CH4
  • Recovery: > 99%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN LF

Energy

METHAGEN LF

  • Feedstock: Manure
  • Offtake: Pipeline quality RNG
  • Location: USA
  • Installed: 2023
  • Capacity: 750 Nm3/h | 450 scfm
  • Performance: > 97% CH4
  • Recovery: > 99.5%
  • OpEx: 0,22 kWh/Nm3 | 0.354 kW/scfm of biogas
METHAGEN LF

METHAGEN LF

2 STAGE

  • Feedstock: Landfill Gas
  • Offtake: CNG for transportation and commercialization
  • Location: Minas Gerais, Brazil
  • Installed: 2026
  • Capacity: 3 × 2,500 Nm³/h | 3 × 1,500 scfm
  • Performance: Superior with high levels of N₂
  • Recovery: > 99.5%
  • OpEx: Low electricity consumption, delivering gas at 8 bar

Talk to an Engineer

Need technical advice? Our engineering team is ready to help you define the best solution for your application.

Alan Johnson

Sr. Director of Sales & Business Development

Contact Us
Alan Johnson

Get a Quote

Ready to move forward? Request a detailed proposal tailored to your needs.

Request Quote