The new METHAGEN AD Micro 165 | 330 makes Biomethane production simpler and more accessible for small-scale installations.
With the compressor, VPSA system and main pre-treatment components fully integrated and pre-assembled in a single container, installation is reduced to just three on-site connections: Biogas inlet, Biomethane outlet and power supply.
The H₂S removal system is installed externally for enhanced safety.
Compact design. Faster installation. Low implementation costs.
More info: https://sysadvance.com/energy/